The Company has made all payments required to satisfy the existing agreement on the Dale Property until December 31, 2022 and, following the completion of its Phase 1 Exploration Program, Element79 (1) Element79 Gold Corp., May 4, 2021, 43-101 Technical report on the Dale Property, Section 9.6, available on SEDAR
(2) IamGold Corp., February 17, 2021, Annual Information Form
https://s2.q4cdn.com/610165863/files/doc_downloads/2021/02/FINAL-2020-AIF-Feb-17-2021.pdf (3) IamGold Corp., July 21 2020, News Release
https://www.iamgold.com/English/investors/news-releases/news-releases-details/2020/IAMGOLD-to-Proceed-with-Construction-of-the-Ct-Gold-Project-in-Ontario-Canada/default.aspx (4) Figure 1.
A. Cote Lake Deposit: IamGold Corp., February 17, 2021, Annual Information Form
https://s2.q4cdn.com/610165863/files/doc_downloads/2021/02/FINAL-2020-AIF-Feb-17-2021.pdf B. Island Gold Deposit: Alamos Gold Inc., March 23, 2021, Annual Information Form,
https://s24.q4cdn.com/779615370/files/doc_downloads/2021/AnnualInformationForm2020/991-2020-Annual-Information-Form-March-30-2021-FINAL.pdf C. Borden Deposit: Probe Mines Ltd., June 10, 2014, 43-101 Technical Report: Mineral Resource Estimate Update, Borden Gold Project, Project No. V1393, available on SEDAR
D. Jerome Deposit: Augen Gold Corp., August 6, 2011, 43-101 Technical Report on a Resource Estimate on the Jerome Mine Property, available on SEDAR
E. Timmins Camp Gold Production: DigiGeoData, June 2021 Map
https://digigeodata.com/area/timmins/Gold has increased the size of its existing 1,735 hectare property by staking an additional 245.5 hectares directly adjacent to the Western and North-Western borders of its existing claims, bringing the total land package to 1,980.5 hectares.
Following up on the high-resolution data obtained from the drone-based magnetic survey completed by Element79 Gold in 2021, Element79 Gold has completed its Phase 1 Exploration Program, consisting of trenching, channel sampling, prospecting, mapping and soil sampling following up on historic prospecting by the vendors of the property which has yielded up to 3.82 g/t gold, including several highly anomalous samples grading greater than 0.1 g/t gold, with assay results pending. The mineralization present on the Dale property is associated with zones of strong silicification and disseminated pyrite, which the Company believes are prospective for bulk tonnage style gold mineralization. The Company intends to pursue the Phase 2 work program (including 1,500m of diamond drilling) as recommended within the 43-101 Technical Report following favourable results from Phase 1.(1)
The Dale Property is a highly prospective early-stage gold project located in the Swazye greenstone belt, which is turn is part of the Abitibi Subprovince which hosts some of the world's largest gold deposits, e.g. the Timmins camp which has produced over 70 million ounces of gold (Figure 1). The Swazye greenstone belt is best known for hosting IamGold's Côté Lake deposit which contains 10.2 million ounces Measured and Indicated and 3.8 million ounces Inferred(2), and is located 50 km southeast of the Dale Property (Figure 1). The Côté Lake project received a Positive Construction Decision in July 2020(3) and plans to achieve commercial production in 2023.